Metalist has completed the following projects:
- Complete Engineering of the Steel Melting Shop consisting of 35 Ton per Hour Electric Arc Furnace/Ladle Furnace/Vacuum Degasser and a Bloom Caster at Arora Iron & Steel Rolling Mills (P) Ltd. at Ludhiana Punjab.
- Helping the above to establish the product for approval at major alloy steel automotive component manufactures.
- Technical Assistance to a major alloy steel producer to regain its productivity, quality & cost.
- Complete Detailed Project Report for a 1.0 M tons steel plant in the Middle east/North Africa.
- Technical Feasibility Report for Tata Steel.
- Special profile rolling for the automotive industry and import substitution.
- Feasibility study for proposed Mini Steel Plant for setting up of down -stream capability including manufacturing of machinery.
- Project financing for manufacturing plants.
- Technical and Financial evaluation related work for State Bank of India (SBI).
- Design/Engineering of in-plant projects.
Metalist is now engaged in the following projects:
- Improvement in operation and productivity in induction furnace -continuous casting- TMT rolling process in India and Africa.
- Rolling of several new profiles for fork lift machine building – import substitution
- TEV report for corporates financed by State Bank Of India
- Engineers’ consultant for a non-ferrous plant
- Operating excellence for an integrated steel plant using BF-BOF-CCM- Special Rolling process
- Modernization of a Rolling Mill to roll large size CC Blooms for Over seas OEM customers
- Reduction of cost by process discipline and establishment of best practices in a Alloy steel Plant.
- New Product launches at a major Government of India steel plant with R&D back up from IIT.
- Development of low residual steel at an established Induction Furnace based TMT steel maker to comply with the stringent requirements of the Bureau of Indian Standards.